Image of Mackinac Bridge with text below on the water, "Defuse the ticking time bomb in the Great Lakes"

Revealed: Line 5 Tunnel Would Be Built By Trump Border Wall Contractor 

FOR IMMEDIATE RELEASE  News from Progress Michigan. Friday, May 10, 2024  Contact: Denzel McCampbell, 313-400-0298, denzel@progressmichigan.org  Revealed: Line 5 Tunnel Would Be Built By Trump Border Wall Contractor  MICHIGAN – Recently multiple news sources reported that Canadian fossil fuel giant Enbridge selected two contractors to construct the Line 5 oil tunnel. One of the contractors named is Barnard Construction, whose subsidiary received a federal contract under President Donald Trump…

Things That Go Boom

Image via Wikipedia You can’t make this stuff up, folks. First, the so-called leaders of Michigan’s state Legislature, Senate majority Leader Mike Bishop and Speaker of the house Andy Dillon, blow a Sept. 2 deadline to put a permanent ban on drilling for oil in the Great Lakes on the November ballot. Cue up the…